![pipeline crossing airbridge pipeline crossing airbridge](https://mavensphotoblog.com/wp-content/uploads/2012/07/Pipeline-crossing-Colorado-River-1.jpg)
The drawing(s) must be prepared in accordance with the minimum standards as set out in the Drawing Requirements section of this document. HOW TO APPLY FOR ENBRIDGE CONSENT The applicant must submit a written request, either by completing the Application Form (attached) or a letter with equivalent information, together with the applicable drawing(s) to the respective Enbridge crossings department as set out in the Contact Us section of this document. However, if neither of the above requirements can be met then an application must be submitted to Enbridge for further review and processing. For pipelines regulated by the Alberta Energy Regulator, the Pipeline Regulation (under the Pipeline Act) provides that persons operating vehicles or equipment used for farming operations or use of off-highway vehicles or use of private passenger vehicles (as defined in section 1(1)(jj) of the Traffic Safety Act) less than ¾ ton may temporarily cross over an AER regulated pipeline without further approval from Enbridge. This applies to vehicles or mobile equipment used for agricultural activities in the production of crops and the raising of animals and includes pasturing and cultivation activities such as tillage, plowing, disking and harrowing. The point of crossing has not been the subject of a notification from the pipeline company that crossing at that location could impair the pipeline’s safety or security. The loaded axle weight and tire pressures of the vehicle or mobile equipment are within the manufacturer’s approved limits and operating guidelines AND CROSSING A PIPELINE WITH AN AGRICULTURAL VEHICLE OR MOBILE EQUIPMENT For pipelines regulated by the Canada Energy Regulator, the Canadian Energy Regulator Pipeline Damage Prevention Regulations – Authorizations provides that persons operating agricultural vehicles or mobile equipment across pipelines may do so in low-risk areas, under certain conditions:
![pipeline crossing airbridge pipeline crossing airbridge](https://i.ytimg.com/vi/onnf6ymCzM4/maxresdefault.jpg)
![pipeline crossing airbridge pipeline crossing airbridge](https://portadam.com/wp-content/uploads/2017/02/PipelineCrossing-2-960x640x73.jpg)
Pipeline less than that approved at time of constructionĢ. Tree or shrub planting installing agricultural drainage tile Under section 2 of the Canadian Energy Regulator Act, ground disturbance does not include:Ĭultivation to a depth of less than 45cm below the surface of the ground Any activity to a depth of less than 30cm and that does not result in reduction of the depth of earth cover over the Infrastructure by heavy loads off the travelled portion of a public roadway Travelled portion of a highway or public road Using explosives within 300m of Enbridge’s pipeline right-of-way Use of the prescribed area or controlled area for storage or workspace purposes Subdivision development across, on, along or over Enbridge’s pipeline and/or right-of-way Landowners wishing to install agricultural drainage tile across, on, along or under Enbridge’s pipeline and/or right-Īctivities that cause a ground disturbance include, but are not limited to, the following: digging clearing and stump removal excavation subsoiling trenching blasting/using explosives ditching quarrying tunneling grinding and milling of asphalt/concrete boring/drilling/pushing seismic exploration augering driving fence posts, bars, rods, pins, anchors or pilings topsoil stripping plowing to install underground infrastructure land levelling/grading crossing of buried pipelines or other underground Side of the centerline of the pipeline Operation or movement of vehicles, mobile equipment or machinery across Enbridge’s right-of-way, outside of the To ensure our pipelines and facilities operate safely written consent from Enbridge must be obtained in Canada before any of the following occur:Ĭonstruction or installation of a new facility across, on, along or under Enbridge’s pipeline and/or right-of-way Ground disturbance activities in the prescribed area (CER) or controlled area (AER) which extends 30m from each WHO REQUIRES CONSENT? Consent is governed by the Canada Energy Regulator (CER) for interprovincial or international (federally regulated) pipelines and the Alberta Energy Regulatory (AER) for intra-provincial (provincially regulated) pipelines within the Province of Alberta.